Click here to make tpub.com your Home Page

Page Title: Section III. CONTROLS AND INSTRUMENTS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-274-15
Section III. CONTROLS AND lNSTRUMENTS
line pressure has reduced to 400 psig, the high
2-9. General
pressure cutout control can be reset by pushing
This salon describes, locates, illustrates, and
the reset button (fig. 3-13).
furnishes the operator, crew or organizational
c. Low Pressure Cutout Control. The low pres-
maintenance personnel sufficient information
sure cutout located at the upper left rear of the
about the various controls and instruments for
unit (fig. 1-3) is designed to sense line pressure
proper operation of the air conditioner.
from the compressor and will cutout at 25 psig
pounds per square inch gage. When the line pres-
2-10. Controls and Instruments
sure has increased to 50 psig, the low pressure
a. General. The purpose of Controls and instru-
cutout control can be reset by pushing the reset
ments and their normal and maximum readings
d. Liquid Line Sight Glass. The sight glass
are illustrated in figure 2-2.
b. High Pressure Cutout Control. The high
(fig. 1-3) indicates dryness of the system. Mois-
pressure cutout located at the upper left rear of
ture in the refrigerant is shown by the indicator
turning from green to yellow. A shortage of re-
the unit (fig. 1-3) is designed to sense line pres-
frigerant is indicated by flash gas in the sight
sure from the compressor and will cutout at 445
glass.
psig (pounds per square inch gage). When the

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business