|
|
Section I. SERVICE UPON RECEIPT OF MATERIEL
contained unit; however, in certain installations it
may become desirable to utilize the remote control
a. Perform daily, weekly, monthly and quarterly
blockoff plate with the electrical receptacle.
preventive maintenance services (table 3-1).
b. Blockoff Plate. The blockoff plate is provided
b. Inspect entire air conditioner for signs of
for installation when the control panel assembly is
d a m a g e , paying particular attention to tubing,
removed for remote control operation. The blockoff
evaporator and condenser coils and fans.
plate provided must be used so that no air will enter
c. The air conditioner contains a full charge of
the lower compartment, Refer to figure 2-1 and
refrigerant and compressor oil. No further service is
install the blockoff plate.
required.
2-2. Installation
a. General. The air conditioner is basically a self-
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |