Click here to make tpub.com your Home Page

Page Title: Chapter 2. OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Section I. SERVICE UPON RECEIPT OF MATERIEL
2-1. Inspecting and Servicing Equipment
contained unit; however, in certain installations it
may become desirable to utilize the remote control
a. Perform daily, weekly, monthly and quarterly
blockoff plate with the electrical receptacle.
preventive maintenance services (table 3-1).
b. Blockoff Plate. The blockoff plate is provided
b. Inspect entire air conditioner for signs of
for installation when the control panel assembly is
d a m a g e , paying particular attention to tubing,
removed for remote control operation. The blockoff
evaporator and condenser coils and fans.
plate provided must be used so that no air will enter
c. The air conditioner contains a full charge of
the lower compartment, Refer to figure 2-1 and
refrigerant and compressor oil. No further service is
install the blockoff plate.
required.
2-2. Installation
a. General. The air conditioner is basically a self-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business