Click here to make tpub.com your Home Page

Page Title: TOP OF HOUSING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 54120-341-13
ACTION
REMARKS
LOCATION/lTEM
TOP OF HOUSING
a.
Connect suction and discharge pressure guages
7. Compressor
to the suction and discharge service valves.
b.
Open suction and discharge service valves.
c.
Operate the air conditioner in the cooling
mode and verify that the normal operating
pressures are as follows:
Normal Operating Pressures
Suction Pressure
Discharge Pressure
Suction Pressure
Discharge Pressure
d.
Stop air conditioner,
e.
Close suction and discharge service valves.
f.
Remove guages.
Operate the air conditioner in the cooling
9.
mode and using a multimeter, measure the
insuIation  resistance  of  the  compressor
internal motor windings at the start relay and
selector switch.
h.
Verify that the insulation resistance between
the windings and compressor frame is NOT
less than 60 megohms.
i.
Verify that the insulation resistance of the
m a i n winding (terminal pin A to C) is
between .6 and .8 ohms.
Verify that the insulation resistance of the
j.
auxiliary winding (terminal pin A to B) is
between 5 and 7 ohms.
k.
If testing indicates that the compressor is
defective, remove or repair compressor.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business