|
|
TM 5-4120-356-14
REMOVAL OF TERMINAL BOARD TB1
REMOVAL OF TERMINAL BOARD TB2
REFER TO PARAGRAPH 3-10m FOR PRE-
1.
REFER TO PARAGRAPH 3-10m FOR PRE-
1.
LIMINARY STEPS IN THE REMOVAL OF
LIMINARY STEPS IN THE REMOVAL OF
TERMINAL BOARD TB1.
TERMINAL BOARD TB2.
2. TAG AND DISCONNECT ELECTRICAL
2. TAG AND DISCONNECT ELECTRICAL
LEADS FROM TB2.
LEADS FROM TB1.
3. REMOVE FOUR SCREWS (1) AND RE-
REMOVE FOUR SCREWS (3) AND NUTS
3.
MOVE TERMINAL BOARD (2) FROM
(4) THEN REMOVE TERMINAL BOARD
BRACKET (6).
(5) FROM BRACKET (6).
INSTALLATION OF TERMINAL BOARD TB1
INSTALLATION OF TERMINAL BOARD TB2
1. POSITION TERMINAL BOARD TB1 (2)
1. POSITION TERMINAL BOARD TB2 (5)
ON BRACKET (6) AND SECURE WITH
ON BRACKET (6) AND SECURE WITH
FOUR SCREWS (3) AND NUTS (4).
FOUR SCREWS (1).
2. CONNECT ELECTRICAL LEADS TO
2. CONNECT ELECTRICAL LEADS TO THE
PROPER TERMINALS ON TERMINAL
PROPER TERMINALS ON TERMINAL
BOARD AND REMOVE TAGS FROM LEADS.
BOARD AND REMOVE TAGS FROM
LEADS .
3. REFER TO PARAGRAPH 3-10m FOR FINAL
STEPS IN THE INSTALLATION OF TER-
3. REFER TO PARAGRAPH 3-10m FOR FINAL
MINAL BOARD TB2.
STEPS IN THE INSTALLATION OF TERM-
INAL BOARD TB1.
TS54120-356-14/3-19
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |