4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: Section IV ITEMIZED MAINTENANCE PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-359-14
Section IV ITEMIZED MAINTENANCE PROCEDURE
4-13. GENERAL
The procedures in this section have been arranged in the order in which the items appear in the direct support (F)
maintenance category column on the Maintenance Allocation Chart (MAC) which is provided in Appendix B. Step-by-step
procedures have been provided for all authorized to be performed by direct support maintenance in the order in which
they appear on the MAC. Actions authorized to be performed by general support maintenance have been duly noted;
step-by-step procedures for these actions may be found in Chapter 5.
4-14. EVAPORATOR ASSEMBLY AND CONDENSER ASSEMBLY SEPARATION AND RECONNECTION
Preliminary Procedures:
1. Remove air conditioner from shelter. (See paragraph 3-6.)
2. Remove access cover, (See paragraph 3-14.)
3. Remove right end condenser cover. (See paragraph 3-26.)
4. Remove left end condenser cover (See paragraph 3-27.)
4-38

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business