TM 5-4120-359-14
(16) Leak test the coil, the dehydrator, the newly brazed joints, and the joints in the area of the newly brazed
joints per paragraph 4-8.
(17) Evacuate and charge the refrigeration system in accordance with paragraphs 4-9 and 4-10.
Follow-on Procedures: 1. Install the heater assembly. (See paragraph 4-32.)
2. Install the front evaporator cover and radio frequency fitter. (See paragraphs 3-17 and 4-17.)
3. Install the access cover. (See paragraph 3-14.)
4. Install the return air screen and frame. (See paragraph 3-18.)
5. Install air conditioner on shelter. (See paragraph 3-6.)
4-38. TUBING AND FITTINGS (EVAPORATOR ASSEMBLY)
The evaporator assembly contains a number of pieces of copper tubing in a variety of material grades; sizes, lengths, and
shapes and a number of elbows, tees, and adapters. Observe the following when replacing any piece of tubing or fitting
in the system:
Preliminary Procedures: 1. Remove air conditioner from shelter. (See paragraph 3-6.)
2. Remove evaporator coil and piping. (See paragraph 4-34.)
4-88
|