Click here to make tpub.com your Home Page

Page Title: REFRIGERANT PIPING AND SERVICE VALVES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-374-13
This task covers:
c. Repair
a. Removal
d. Installation
b. Test
INITIAL SETUP
References
Material/Parts
Top Center Panel Screws (10)
Troubleshooting Reference
Top Front Panel Screws (7)
AIR CONDITIONER, Malfunction 5, Step 2
Top Rear Panel Screws (9)
Right Side Panel Screws (17)
Approximate Time Required (in minutes)
Rear Panel Screws (14)
20
Removal
Left Side Panel Screws (17)
30
Testing and Repair
Return Air Grill Screws (8)
750
Installation
Air Diffuser Grill Screws (8)
800
TOTAL TIME
Control Panel Plate Screws (2)
Front Panel Screws (14)
REMARKS
ACTION
LOCATION/lTEM
TOP AND LEFT SIDE OF HOUSING
a. Remove ten (10) screws securing top center panel.
1. Top Center Panel
b. Remove top center panel.
a. Remove seven (7) screws securing top front panel.
2. Top Front Panel
b. Remove top front panel.
3. Top Rear Panel
a. Remove nine (9) screws securing top rear panel.
b. Remove top rear panel.
4. Left Side Panel
a. Remove seventeen (17) screws securing left side panel.
b. Remove left side panel.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business