Click here to make tpub.com your Home Page

Page Title: CONDENSER AIR DISCHARGE LOUVER AND LINKAGE.-Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-383-14
4-17.
CONDENSER AIR DISCHARGE LOUVER AND LINKAGE.-Continued
Replacement.
c.
Do not tamper with cylinder or refrigerant tubing
connections.
If actuating cylinder is suspected bad,
contact direct support maintenance.
(1) Louver blade only.
NOTE
Individual Louver Blades are flexible enough for
removal.
q Remove
top rear cover (para 4-11).
Remove push on nut from louver blade to be removed.
Flex or spring blade to remove ends from bearings.
Remove blade.
Replace bearings if they are damaged.
Flex or spring new blade and install.
Install push on nut.
(2) Louver and linkage assembly removal.
Remove condenser air inlet guard.
Loosen mechanical post screw and pull push-pull
control cable wire from louver connecting link.
Remove four screws and lock washers and two snap
fasteners.
Slide louver assembly from unit.
Remove push-pull control cable and attaching hardware
(mechanical post, screws, etc.).
Inspect all parts and replace if damaged.
4-51

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business