|
|
TM 5-4120-386-14
This task covers:
a.
Repair
d.
Inspection
Installation
e.
b.
Removal
c.
Test
INITIAL SETUP
Equipment
Condition
Conditicm Description
Para
Rear Top Cover removed.
Evaporator inlet louver removed.
Spec ial Tools
Test Equipment
Tool Kit SC 5180-90-CL-N18
Continuity Tester
Materials/Parts
Solder (Item 2, App. D)
Flux (Item 15, App. D)
REMARKS
ACTION
LOCATION/ITEM
Disconnect air conditioner power
supply before doing maintenance
work on the electrical system.
Inspect all installed wiring
Inspection
a.
for cracked or frayed insulation.
Pay particular attention to wires
passing through holes in the
frame or routed around sharp
edges.
Inspect electrical connectors
b.
(1) and lugs (2) for damage.
4-65
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |