|
|
TM 5-4120-386-14
This task covers:
a.
c. Test
Removal
Inspection
b.
d . Installation
INITIAL SETUP
Equipment
Condition
Para
Condition Description
Front Top Cover removed.
Evaporator Inlet Louver removed.
Control Module removed.
Junction Box partially removed.
Test Equipment
Variable Voltage Power Source (AC/DC)
Materials/Parts
Special Tools
Tool Kit SC 5180-90-CL-N18
Solder (Item 2, App. D)
Heat Gun
Flux (Item 15, App. D)
REMARKS
LOCATION/ITEM
ACTION
Disconnect air conditioner power
source and discharge capacitors
before doing work on elecrtical
system.
a.
See Figure E-1.
Removal
Tag and discomect leads.
Remove screws (l).
b.
c.
Remove rectifier (4) from unit.
Remove shrink sleeving from
d.
capacitor C6 (3).
e.
Desolder capacitors (2 and 3).
4-68
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |