Click here to make tpub.com your Home Page

Page Title: HEATER ELEMENTS-INSPECT/TEST/REPLACE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-386-14
4-33. HEATER ELEMENTS-INSPECT/TEST/REPLACE.
This task covers:
Inspect
Removal
a.
c.
b.
Test
d.
Installation
INITIAL SETUP
Equipment
Condit ion
Para
Condition Description
Top covers removed.
Junction box pulled half way out of unit.
Special Tools
Test Equipment
Tool Kit SC 5180-90-CL-N18
Materials/Parts
Toluolene (Item 27, App. D)
Adhesive (Item 18, App. D)
Insulation (Item 25, App. D)
Swab Brush (Item 29, App. D)
Lint-Free Cloth (Item 9 App. D)
REMARKS
LOCATION/ITEM
ACTION
Allow heating elements to cool for
15 minutes before touching.
Disconnect air conditioner power
supply before doing maintenance
work on the electrical system.
4-87

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business