|
|
TM 5-4120-386-14
This task covers:
Inspect
Removal
a.
c.
b.
Test
d.
Installation
INITIAL SETUP
Equipment
Condit ion
Para
Condition Description
Top covers removed.
Junction box pulled half way out of unit.
Special Tools
Test Equipment
Tool Kit SC 5180-90-CL-N18
Materials/Parts
Toluolene (Item 27, App. D)
Adhesive (Item 18, App. D)
Insulation (Item 25, App. D)
Swab Brush (Item 29, App. D)
Lint-Free Cloth (Item 9 App. D)
REMARKS
LOCATION/ITEM
ACTION
Allow heating elements to cool for
15 minutes before touching.
Disconnect air conditioner power
supply before doing maintenance
work on the electrical system.
4-87
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |