|
|
TM 5-4120-386-14
SECTION II DIRECT SUPPORT MAINTENANCE PROCEDURES
5-3. COVERS AND PANELS-REPAIR/REPLACE.
This task covers:
a.
Repair
Installation
b.
INITIAL SETUP
Equipment
Condition
Para
c ondition Description
Top Covers removed as required
Materials/Parts
Special Tools
Flexible polyurethane Foam, (Item
Tool Kit SC 5180-90-CL-N18
20, App. D)
Warm, soapy water
Filter-kote or oil (Item 17, App.
Cellular Rubber strips (Item 19,
LOCATION/ITEM
REMARKS
ACTION
Disconnect air conditioner power input
connector before doing maintenance work
on electrical system.
Repair
a.
1. Canvas Cover
Repair any rips in canvas or seams.
Replace any damaged grommets or snaps.
b.
Replace cover if heavily damaged.
c.
2. Top Covers
Inspect for bent covers, loose,
a.
missing gaskets or foam
insulation.
b. Clean dirty covers with warm,
soapy water.
c. Straighten or replace damaged
covers.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |