| |
TM5-4120-387-14
4-23. TOP PANEL
Preliminary procedure:
Remove air conditioner (fabric) cover.
(See para 4-13.)
Figure 4-19. Top Panel
a.
Removal
(1) Using screwdriver, remove sixteen screws and rain seal washers from top
panel .
(2) Remove top panel.
b.
Inspection
(1) Check that panel is not bent, cracked, or punctured.
(2) Check that gaskets and insulation are not torn, loose, or missing.
(3) Refer repairs/replacement of gaskets and insulation to your supervisor
and Direct Support Maintenance.
4-64
|