4120-01-238-4277">
|
|
TM 5-4120-393-14
4-46. Junction Box Number Two (cont)
INSPECTION, TESTING, REPAIR, AND REPLACEMENT
See the following paragraphs for individual component inspection, testing, repair, and replacement.
1.
Junction Box Number Two wiring Harnesses. See para 4-47.
2.
Fuses (F1, F2, and F3). See para 4-48.
3.
Transformer (T). See para 4-49.
4.
Time Delay Relay (K6). See para 4-50.
5.
Control Relay (K10). See para 4-51.
6.
Rectifier (CR). See para 4-52.
7.
RFI (Radio Frequency Interfer ence) Filters FL1, FL2, FL3, and FL4. See para 4-53.
INSTALLATION
1.
Place junction box (4) in air conditioner and align mounting holes.
2.
Using screwdriver, secure junction box with two screws (2) and flat washers (3) in lower junction box mounting foot
and three screws (1) in the side of the junction box.
3.
Connect the following harness connectors: P21 to J21 and P23 to J23.
NOTE
FOLLOW ON MAINTENANCE:
1. Install lower front panel. See para 4-24.
2. Connect power.
4-110
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |