4120-01-238-4277">

 

Click here to make tpub.com your Home Page

Page Title: Junction Box Number Two
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-393-14
4-46. Junction Box Number Two
This task covers:
a. Removal
c. Installation
b Inspection, Testing, Repair, and Replacement
Initial setup.
Tools:
Tool kit, service, refrigeration unit NSN 5180-00-596-1474
Personnel: 1
Equipment condition:
1. Turn unit power off at power source. If there is a chance that it will be turned on, also disconnect power
cable to air conditioner.
2. Remove lower front panel. See para 4-24.
3. Remove control panel. See para 4-35.
General Safety Instructions:
WARNING
Disconnect input power to the air conditioner before performing any internal
maintenance. Voltages used can KILL. Shutting the unit off at the control panel
does not disconnect unit power.
REMOVAL
1.
Disconnect P21 and P23 harness connectors from junction box connectors J21 and J23.
2.
Using screwdriver, remove three screws (1) from side of junction box (4).
3.
Using screwdriver, remove two screws (2) and flat washers (3) from lower junction box mounting foot.
4.
Carefully lift junction box (4) up and out of air conditioner.
4-109

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business