4120-01-238-4277">

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-393-14
5-18. Liquid Indicator (cont)
INSTALLATION
1.
Position liquid indicator in unit.
2.
While purging the system with nitrogen, braze the tubing joints. See para 5-10 and 5-11.
3.
Replace the dehydrator. See para 5-16.
4.
Leak test all newly connected joints and those in the repair area. See para 5-12.
5.
Position bracket (3) and secure with two washers (2) and screws (1).
6.
Evacuate and charge the refrigerant system. See para 5-13 and 5-14.
NOTE
FOLLOW ON MAINTENANCE:
1. Install lower front panel. See para 4-24.
2. Connect power.
5-42

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business