TM 55-8145-221-14&P
Change 1
0018 00-2
REFRIGERATED CONTAINER SYSTEM
UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES Continued
0018 00
Table 1. Unit Preventive Maintenance Checks and Services to be performed WEEKLY while operating the
Refrigerated Container System.
NOTE
If the equipment must be kept in continuous operation, do only the procedures that
can be done without disturbing operation. Make complete checks and services when
the equipment is shut down.
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
EXTERIOR
I.
Weekly
0.1
Refrigeration
Unit
a. Check for loose mounting hardware.
Mounting bolts
damaged or
missing.
0.1
b. Check security of power cable
connection.
b. Perform Weekly PMCS on
Refrigeration Unit (TM 9-4110-258-
13).
2.
Weekly
0.1
Generator Set
a. Check for loose, missing or damaged
mounting hardware.
Mounting bolts
damaged, loose or
missing.
b. Perform Weekly PMCS on generator
set (TM 9-6115-642-10).
3.
Weekly
0.1
Auxiliary Fuel
Tank
a. Check fuel tank for loose or missing
attaching hardware.
Mounting bolts
loose, cracked or
missing.
0.1
b. Inspect fuel tank for corrosion.
Fuel tank leaks.
0.1
c. Inspect fuel lines for deterioration and
leakage.
Fuel lines cracked,
split or leaking
4.
Weekly
0.1
Temperature
a. Inspect temperature-sensing tube for
dents, kinks and punctures.
Sensing line
kinked or
punctured.
0.1
b. Check for loose mounting hardware.
|