Click here to make tpub.com your Home Page

Page Title: OPERATION UNDER UNUSUAL CONDITIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
OPERATION UNDER UNUSUAL CONDITIONS
INITIAL SETUP:
Maintenance Level
Operator
References
Equipment Condition
Mode selector switch in OFF position.
Correct voltage and phase power source (208 volts, three-phase 50/60 Hz) available.
Perform operator PMCS (WP 0011-00) as necessary.
General Installation Site Requirements
A relatively level surface.
An unobstructed flow of air from outside the area.
An unobstructed flow of air from inside the conditioned area.
An unobstructed flow of air from outside the conditioned area to the fresh air intake.
NOTE
The air conditioner can be equipped for operation in chemical biological radiological (CBR)
environment by connecting filtering equipment to the rectangular covered opening to the lower right of
the fan guard in the rear of the unit.
0007-00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business