|
|
TM 9-4120-425-14&P
UNIT MAINTENANCE
SERVICE UPON RECEIPT
THIS WORK PACKAGE COVERS:
Unloading, Unpacking, Checking Unpacked Equipment, Installation, Connect to Power Source, Operation
Check and Adjustment
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
Tool Kit, General Mechanics (Item 1, Table 2, WP 0118-00)
References
Equipment Condition
Main power source is disconnected.
UNLOADING
The air conditioner is packaged in a container designed for shipment and handling with the unit in an upright position.
The base of the container is constructed as a shipping pallet with provisions for the insertion of the tongs of a forklift.
The unit may be lifted by forklift, crane, or sling. To unload the air conditioner, perform the following steps.
1.
Remove all blocking and tie downs that may have been used to secure the container to the carrier
WARNING
Do not allow the unit to swing while suspended from a lifting device. Failure to
observe this warning may result in injury to personnel and damage to the equipment.
CAUTION
Use care when handling to avoid damage to the air conditioner. If an overhead lifting
device must be used, use an appropriate sling so that the weight of the unit is
supported by the base of the shipping container.
2.
Use a forklift truck or other suitable material handling equipment to remove the unit from the carrier.
UNPACKING
CAUTION
To protect the air conditioner and prevent damage, the air conditioner should be left
packaged until it is moved to the location where it is to be installed.
0015-00-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |