Click here to make tpub.com your Home Page

Page Title: High and Low Voltage Heater Cutout Switches S3 and S6
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
HEATER CUTOUT SWITCHES UNIT MAINTENANCE - Continued
0027-00
TEST
High and Low Voltage Heater Cutout Switches S3 and S6
1.
Using a multimeter on the lowest possible setting, test for continuity between contacts 1 and 2 and between contacts
3 and 4 on switch S3. See Schematic Diagram, WP 0122-00.
2.
Using multimeter on lowest possible settings test for continuity between contacts 1 and 2 and between contacts 3
and 4 on switch S6.
3.
Replace if defective.
INSTALLATION
1.
Connect two leads to switch S6 (7) and remove tags.
2.
Connect four leads to switch S3 (3) and remove tags.
3.
Attach switch S6 (7) to bracket (4) with two screws (5) and two washers (6).
4.
Attach switch S3 (3) to bracket (4) with two screws (1) and two washers (2).
5.
Install top panels. See WP 0019-00.
0027-00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business