Click here to make tpub.com your Home Page

Page Title: HEATER CUTOUT SWITCHES UNIT MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
HEATER CUTOUT SWITCHES UNIT MAINTENANCE
THIS WORK PACKAGE COVERS:
Inspection, Removal, Test and Installation
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
Tool Kit, General Mechanics (Item 1, WP 0118-00)
Materials/Parts
150-watt lamp bulb or heat gun
Test Equipment
References
Schematic Diagram, WP 0122-00
Equipment Condition
Air conditioner shut down and cool.
Power disconnected from unit.
Top covers removed (WP 0019-00).
WARNING
Disconnect air conditioner power supply.
WARNING
Allow heating elements to cool for 15 minutes before touching.
INSPECTION
Inspect for wiring damage.
REMOVAL
1.
Take out two screws (1) and two washers (2) to remove the high voltage heater cutout switch S3 (3) from switch
bracket (4).
2.
Take out two screws (5) and two washers (6) and remove the low voltage heater cutout switch S6 (7) from switch
bracket (4).
3.
Tag wire leads.
0027-00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business