Click here to make tpub.com your Home Page

Page Title: REPAIR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
MAIN POWER INPUT CONNECTOR (J2) and ALTERNATE POWER INPUT
0043-00
CONNECTOR (J1) UNIT MAINTENANCE - Continued
REPAIR
1.
Remove the insulation to expose 1/2 inch/l.27 centimeters of bare wire on each side of break or damaged insulation.
2.
Insert the ends into a splice-connector; splice and crimp the connector to make firm electrical contact.
3.
Alternatively, heat-shrink tubing may be slipped over one end of the wire before splicing, then heated after the
splice is made and soldered, so as to cover the spliced area.
4.
Be sure that no bare wire is exposed after the splice is complete.
5.
Replace broken terminal lugs with exact duplicates.
6.
To replace electrical plugs or connectors, tag and unsolder wires from the solder-wells of the inserts.
7.
Insert bare ends of the wires in corresponding holes of new insert, and solder in place.
8.
Check continuity terminal-to-terminal.
INSTALLATION
1.
Transfer tags to new harness.
2.
Refer to WP 0033-00 for J2 connector installation.
3.
Install each connector into unit housing with four screws (1), four washers (2) and four nuts (3).
4.
Route each harness in the same manor as disassembled.
5.
Connect all connector plugs and terminals and remove tags. Use Schematic Diagram, WP 0122-00.
6.
Install top covers. See WP 0019-00.
END OF TASK
0043-00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business