|
|
TM 9-4120-430-14
0014 00
g.
Disconnect blue wire from CB-A3 to TB1-3 at TB1-3 and reconnect it at TB1-6.
h.
Install marker strip over terminal board TB1 and secure with two lock nuts (16).
i.
Install junction box assembly into unit (WP 0028 00).
OPERATION CHECK AND ADJUSTMENTS
1. Check operation of unit.
2. Check for proper power wiring sequence (ABC) which effects compressor direction of rotation. Incorrect wiring
results in noisy compressor operation with little or no cooling. Prolonged operation in reverse direction will damage
compressor.
Figure 2. Installation Dimensions (Sheet 1 of 2)
0014 00-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |