Click here to make tpub.com your Home Page

Page Title: OPERATION CHECK AND ADJUSTMENTS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-430-14
0014 00
g.
Disconnect blue wire from CB-A3 to TB1-3 at TB1-3 and reconnect it at TB1-6.
h.
Install marker strip over terminal board TB1 and secure with two lock nuts (16).
i.
Install junction box assembly into unit (WP 0028 00).
OPERATION CHECK AND ADJUSTMENTS
1. Check operation of unit.
2. Check for proper power wiring sequence (ABC) which effects compressor direction of rotation. Incorrect wiring
results in noisy compressor operation with little or no cooling. Prolonged operation in reverse direction will damage
compressor.
Figure 2. Installation Dimensions (Sheet 1 of 2)
0014 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business