Click here to make tpub.com your Home Page

Page Title: Table 1. Unit Preventive Maintenance Checks and Services (PMCS) - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-430-14
0015 00
Table 1. Unit Preventive Maintenance Checks and Services (PMCS) - Continued
ITEM TO BE
EQUIPMENT NOT
ITEM
INTERVAL
CHECKED OR
PROCEDURE
READY/AVAILABLE
NO.
SERVICED
IF:
4. Replace damaged impellers (3) or (4)
or motors (1 and 2) (WP 0035 00 and
Figure 4. Evaporator and Condenser Fan Assemblies PMCS
5
Quarterly
Electric Heater
WARNING
Assembly
Ensure power source is
disconnected before doing any
maintenance work on this unit.
1. Remove covers. See WP 0018 00.
2. Check for breaks in wiring (1) and
insulation. See figure 5. Tighten loose
connections.
3. Check heating elements (2) for
damage.
4. Clean heating elements (2).
5. Replace electric heating elements (2) if
0015 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business