|
|
TM 9-4120-430-14
0015 00
Table 1. Unit Preventive Maintenance Checks and Services (PMCS) - Continued
ITEM TO BE
EQUIPMENT NOT
ITEM
INTERVAL
CHECKED OR
PROCEDURE
READY/AVAILABLE
NO.
SERVICED
IF:
10
Annually
Coil (Solenoid)
1. Remove top covers (WP 0018 00).
2. Check wire leads for cracks, breaks,
Repair or replace if any
burns, rubbing and chaffing.
defects are found.
3. Check wiring clamp tie-down for loose
or missing hardware.
4. Check tightness of all electrical
terminals and connections.
5. Check electrical components for
Repair or replace if any
cracks, burns, or electrical arcing or
defects are found.
tracking.
END OF WORK PACKAGE
0015 00-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |