TM 9-4120-430-14
UNIT MAINTENANCE
AIR CONDITIONER, COMPACT, HORIZONTAL
CIRCUIT BREAKER ASSEMBLY MAINTENANCE
REMOVAL, INSPECTION, TEST, REPAIR, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanics (Item 1, Table 2, WP 0067 00)
Materials/Parts
Solder (Item 2, WP 0069 00)
Flux (Item 2, WP 0069 00)
Heat Gun (Item 6, WP 0069 00)
Test Equipment
Continuity Tester
References
Wire Lists and Schematic Diagram (WP 0038 00)
Personnel Required
One
Equipment Condition
Top cover removed (WP 0018 00)
WARNING
Ensure power source is disconnected.
NOTE
Work package procedures apply to either the three pole circuit breaker assembly (S9160-
18KW-3 unit) or the two pole circuit breaker assembly (S9150-18KW-1 unit).
REMOVAL
1. Remove four screws (1) from housing rivet nuts (2) that secure the circuit breaker mounting bracket (3 or 4) to the
rear of the unit housing (5). See figure 1.
2. Pull the circuit breaker assembly away from the housing.
INSPECTION
Circuit Breaker (9 or 10)
1. Inspect toggle for chips, creaks, or damage. Replace circuit breaker if found.
2. Inspect wiring for breaks or damage. Replace if found.
3. Inspect for distinct click and engagement of circuit breaker when placed in ON position. Replace if not found.
0027 00-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |