4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: SOLENOID VALVES (L1 AND L2) (Continued)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-359-14
(5) If the grommet is to be reused, remove it from the coil assembly.
(6) Be sure that the refrigerant has been discharged.
(7) Remove the two screws that attach the tube and plunger assembly to the valve body, remove the tube and
plunger assembly, and then all other removable internal components from the valve body.
(8) While purging system with nitrogen, debraze the tubing from the body. See paragraphs 4-6 and 4-7.
NOTE
Note the arrow direction of flow on valve body.
(9) Using screwdriver, remove two screws, lock washers, and flat washers and remove the valve body.
b. Installation
(1) Disassemble all removable components from the new valve.
NOTE
Step (2) applies only to the L1 solenoid valve.
(2) Install the flush bushings in the valve body.
(3) Position the valve body in the unit. See arrow on valve body and figure 4-74 for proper installation.
(4) Purge system with nitrogen and braze joints. See paragraphs 4-6 and 4-7.
(5) Apply locking compound, item 15, Appendix E, to solenoid valve mounting screw threads.
(6) Using screwdriver, secure valve body to mounting bracket with two screws, lock washers, and flat washers.
(7) Reassemble the internal components in the valve body and install the tube and plunger assembly, and two
attaching screws.
(8) Remove and discard grommet supplied with coil.
(9) Install replacement grommet in coil.
(10) Cut solenoid valve coil leads to 6.00 0.25 inches (15.24 0.63 cm) long.
(11) Install quick disconnect terminal lugs on ends of both leads.
(12) Slip the coil assembly and data plate onto the body tube and plunger assembly.
(13) Using wrench, secure the coil with a nut.
(14) Connect leads to disconnect splices.
(15) Replace the dehydrator. (See paragraph 4-73.)
(16) Leak test all newly connected joints and all tube connections in the area. (See paragraph 4-8.)
(17) Evacuate and charge the refrigerant system in accordance with paragraphs 4-9 and 4-10.
4-150

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business