Click here to make tpub.com your Home Page

Page Title: AC HEATER/EVAPORATOR REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

DRAFT
TB 9-2320-279-13-1
AC HEATER/EVAPORATOR REPLACEMENT
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
THIS WORK PACKAGE (WP) COVERS:
Removal
Installation
Follow-On Maintenance
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Materials/Parts
Maintenance Level
Solution, Soap (Item 7, Appendix E)
Field Level Maintenance
Tags, Identification (Item 9, Appendix E)
Equipment Condition
Ties, Cable (Item 13, Appendix E)
Batteries disconnected (TM 9-2320-279-20).
Personnel Required
Cooling system drained (TM 9-2320-279-20).
MOS 52C, Utilities equipment repairer (2)
Refrigerant recovered (WP 0050).
Skid plate grille removed (TM 9-2320-279-20).
References
AC upper plenums removed (WP 0045).
TM 9-2320-279-10
Tools and Special Tools
TM 9-2320-279-20
Set, Cap and Plug (Item 3, Appendix F)
Shop Equipment, Common No. 1 (Item 4,
Shop Equipment, Common No. 2 (Item 5,
Tool Kit, General Mechanic's (Item 7, Appendix F)
REMOVAL
HEMAC027
1. Loosen screw (1) and remove heater cable (2) from retainer (3).
2. Remove heater cable (2) from heater control valve (4).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business