|
|
TM 10-4110-262-13&P
OPERATOR MAINTENANCE
ADVANCED DESIGN REFRIGERATOR, 281 CUBIC FOOT (ADR-281)
PREVENTIVE MAINTENANCE, CHECKS AND SERVICES
INSTRUCTIONS
INITIAL SETUP
Tools and Special Tools
References
None
None
Materials and Parts
Equipment Conditions
Light Oil Lubricant (WP 0068 00, Item 11)
ADR-300 set-up and operating (WP 0005 00 for
ADR-300 Set-up)
Personnel Required
Operator
Table 1. Preventative Checks and Services.
Item
Intervals
Item to be
Procedures
Equipment not
No.
checked or
ready/available if:
Serviced
Any hole passes through the
1
Before
Insulated
Inspect the container exterior for
inner and outer skins, holes in
Container
major cracks, breaks or dents in the
either skin exceed 1 inch in
(IC)
sides, roof, base, ends, door or fork
length, or 1/2 inch in depth, or
pockets. Inspect the IC interior for
any crack exceeds 1-inch in
cracks, breaks, or dents in any
length.
surface.
Deformed, separated, or
Inspect the sling ring brackets for
missing sling ring brackets.
separation from the IC.
Missing drain plug or
Inspect the exterior drain plug and
condensate drain tube or
condensate drain tube to confirm it
improperly restrained
is properly restrained.
condensate drain tube.
Missing, damaged or
Inspect cargo restraint rails for
corroded cargo restraint rail.
deformation, cracks, breaks or
corrosion.
2
Before
IC Door
Completely open the door. Note
Any moving part does not
Panel
any resistance in the door locks or
move smoothly or the door
hinges. Inspect the door seal.
does not form a proper seal
Close the door, locking the main
around its entire perimeter.
and secondary handles. Note any
resistance to swinging, or
movement of the door locks.
Inspect the perimeter of the door to
insure the door seal lays flat against
the doorframe everywhere.
0010 00-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |