|
|
TM 10-4110-262-13&P
DIRECT SUPPORT MAINTENANCE
ADVANCED DESIGN REFRIGERATOR, 300 CUBIC FOOT (ADR-300)
REFRIGERATION UNIT CONDENSER COIL, EVAPORATOR COIL AND COPPER TUBE
REMOVE/INSTALL
INITIAL SETUP
Tools and special tools
Personnel Required
Tool Kit, Refrigeration Service
HVAC Technician (MOS 52C, AFSC 3E1x1) (1)
References
Materials and Parts
Equipment Conditions
Refrigerant, R404A (WP 0068 00, Item 16)
ADR or RU shut down and disconnected from
Compressor Oil (WP 0068 00, Item 6)
power supply.
Copper tubing (WP 0058 00 and WP 0058 00)
as required
NOTE
The following procedures involve servicing the refrigeration system.
Some of these service procedures are regulated by Federal, and in some
cases, by State and Local laws. All regulated refrigeration service
procedures must be performed by an EPA certified technician, using
approved equipment and complying with all Federal, State, and Local
laws.
NOTE
It is good practice to replace the dehydrator whenever the high side is
opened or when the low side is opened for an extended period of time.
GENERAL
This procedure is limited to removal and replacement of tube sections identified in WP 0057 00 and WP
0034 00-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |