Figure 1. Liquid Solenoid Valve Coil Replacement.
MAINTAINER MAINTENANCE HOT GAS VALVE COIL REPLACE

TECHNICAL MANUAL FOR MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM
Page Navigation
  424    425    426    427    428  429  430    431    432    433    434  
img
.
TM 10-8145-222-23
0047
REPLACE CONTINUED
6. Install coil retainer (Figure 1, Item 6) over replacement coil (Figure 1, Item 5) to secure to liquid solenoid valve
(Figure 1, Item 8). Install replacement coil (Figure 1, Item 5) over enclosing tube assembly (Figure 1, Item 7).
7. Reconnect electrical connector (Figure 1, Item 4) to liquid solenoid valve coil (Figure 1, Item 5) as tagged during
disconnection.
8. Remove wire tags from wire leads (Figure 1, Item 4).
9. Close evaporator cover panel (Figure 1, Item 1) and secure using two bolts (Figure 1, Item 2) and two washers
(Figure 1, Item 3).
10. Reconnect battery (WP 0053, Reconnect).
11. Start refrigeration unit and verify proper operation (TM 10-8415-222-10, Operating Procedures).
12. Place MTRCS back into desired mode of operation (TM 10-8415-222-10, Operating Procedures).
END OF TASK
END OF WORK PACKAGE
0047-3/4 blank