TM 10-8145-222-23
0059
REPLACE CONTINUED
4. Position one person on top of container to make sure cables and piping pass through hole on back of
refrigeration unit when installing.
5. Position forklift, with refrigeration unit lifted, in front of MTRCS frame.
6. Make sure that seven electrical cables (Figure 16, Item 1) are tucked inside refrigeration unit so that they can
be fed through chassis during installation.
Figure 16. Electrical Cable Feeds.