TM 10-8145-222-23
0093
PREPARATION FOR STORAGE CONTINUED
13. Secure cargo nets in stowed position (TM 10-8415-222-10, Unloading).
14. Make sure all doors are closed and properly secured.
END OF TASK
PREPARATION FOR SHIPMENT
1. If using an external electrical source, make sure to disconnect power cable assemblies in accordance with WP
2. Perform PMCS to inspect equipment for damage incurred during use. If equipment is damaged, repair damage
in accordance with applicable repair procedure (TM 10-8415-222-10).
3. Inventory components against Components of End Item (COEI) and Basic Issue Items (BII) lists to verify unit is
complete. Report all discrepancies following the instructions of DA Pam 738-750 or DA Pam 750-8 as
applicable (TM 10-8415-222-10).
4. Check to see if equipment has been modified.
5. Clean interior compartment in accordance with TB MED 530.
6. Secure PLS rollers in stowed position (TM 10-8415-222-10, Store).
7. Secure interior bulkhead in storage position (TM 10-8415-222-10, Store).
8. Secure cargo nets in stowed position (TM 10-8415-222-10).
9. Make sure all doors are closed and properly secured.
END OF TASK
END OF WORK PACKAGE
0093-2