|
|
TM5-4120-347-14
f. Installation.
(1) See the wiring diagram figure 4-5 and tags and connect the wire leads and connectors. Remove the
tags.
(2) Carefully slide the junction box into place and secure with seven screws and lock washers.
(3) See paragraph 4-27c and figure 4-18 and install the control module.
(4) Install the top front cover.
(5) Connect power at power source.
4-35. RELAYS
Relays K2, K3 and K4 and time delay relay K1 and phase sequence relay K5 are located in the junction box.
See figure 4-27.
4-56
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |