TM 5-4120-356-14
(e) Refer to figure 4-4 and evacuate the refrigerant system.
(f) Refer paragraph 4-10 and charge the system with refrigerant.
b.
Low Pressure Cut-Out Switch
(1) Removal. (See figure 4-8.)
(2) Test. (See figure 4-10.)
( 3 ) R e p l a c e . R e p l a c e low pressure cut-out switch if damage to the switch
would impair serviceability or if switch fails during test.
(4)
Installation.
(a) Refer to figure 4-8 and install the low pressure cut-out switch.
( b ) Perform any further maintenance of refrigeration system com-
ponents
required.
( c ) P u r g e t h e r e f r i g e r a n t s y s t e m i n accordanc e wit h th e proce d u r e s
g i v e n in paragraph 4-8.
( d ) Check the low pressure cut-out switch and dehydrator for re-
f r i g e r a n t leaks in accordance with paragraph 4-4c.
R e p a i r any leaks found in accor-
dance with paragraph 4-4d.
(e) Refer to figure 4-4 and evacuate the refrigerant system.
( f ) Charge the system with refrigerant in accordance with paragraph
4-10.
c.
P r e s s u r e Control Switch
(1) Removal. (See figure 4-8.)
(2) Test. (See figure 4-11.)
( 3 ) R e p l a c e . R e p l a c e the pressure control switch if damage to the switch
would impair serviceability or if switch fails during test.
(4)
Installation.
(a) Refer to figure 4-8 and install the pressure control switch.
( b ) Perform any further maintenance of refrigeration system com-
ponents
required.
( c ) P u r g e t h e r e f r i g e r a n t sy s t e m in ac c o r d a n c e wi t h th e proce d u r e s
g i v e n in paragraph 4-8.
(d) Check the pressure control switch and dehydrator for leaks in
a c c o r d a n c e with paragraph 4-4c. R e p a i r any leaks found in accordance with paragraph
(e) Refer to figure 4-4 and evacuate the refrigerant system.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |