Click here to make tpub.com your Home Page

Page Title: DECONTAMINATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-369-14
6-5.
DECONTAMINATION - Continued.
Decontaminate system as follows:
Procedure.
b.
Step 1.
Discharge system (paragraph 6-4) and purge with nitrogen
Step 2.
Remove defective motor-compressor (paragraph 5-31).
Remove dehydrator (paragraph 5-20).
Step 3.
With compressor out of system, purge all lines with dry nitrogen
Step 4.
Install a new compressor (paragraph 5-31) containing a full and proper
Step 5.
oil charge.
Step 6.
Install new dehydrator (paragraph 5-20).
In step (10) this dehydrator
will again be replaced.
Triple evacuate system and charge with refrigerant R22.
Step 7.
Start air conditioner (paragraph 2-5) and operate unit for 24 hours.
Step 8.
Discharge system and purge with nitrogen (paragraph 6-4).
Step 9.
Install new dehydrator (paragraph 5-20).
Step 10.
Evacuate system (paragraph 6-4) and recharge with refrigerant
Step 11.
Operate air conditioner.
Step 12.
6-6.
a.  Inspection.  Inspect coils for damaged tubing and bent fins. Inspect threaded holes
for damaged or stripped threads.
b.  Repair.  Repair any leaks. Straighten bent fins.
Repair or replace damaged tubing
if possible.  Replace coil if repair is not practical.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business