4120-01-238-4277">

 

Click here to make tpub.com your Home Page

Page Title: Table 4-1. UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-393-14
Table 4-1. UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE (cont)
Item
Item To Be
No.
Inspected/Serviced
Procedures
I.
Turn TEMPerature control thermostat knob to fully
INCREASE (clockwise) position, then tur n mode
selector switch to COOL. Note that evaporator and
condenser fans start immediately and that compressor
starts approximately 30 seconds later. Hold your hand
in air flow at the center of the conditioned air outlet
grille; there should be no change in temperature. Now
turn TEMPerature control thermostat knob to fully
DECREASE (counterclockwise) position and feel outlet
air temperature begin to drop almost immediately.
Leave controls in present position and perform next
check.
m.
After 15 minutes of operation, check the sight glass
and compare refrigerant condition with the color coded
information plate provided. (See para 2-3.) Ambient
temperature should be above 70F (21 C).
n.
Turn mode selector switch to OFF and observe that all
air conditioner functions cease.
o.
Set-up the air conditioner for the desired operational
mode.
p.
Record performance of quarterly PMCS, including all
corrective actions taken.
4-34

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business