|
|
TM 9-4120-425-14&P
DESCRIPTION AND USE OF CONTROLS AND INDICATORS - Continued
0005-00
OPERATOR'S CONTROLS - Continued
4. Alternate Input Power Operation
The air conditioner is shipped from the manufacturer wired for operation to use the main input power connector (J2)
located in the front of the unit below the control module. When unit installation makes use of the primary input power
receptacle inconvenient, an alternate input power receptacle is provided to allow power connections to the air
conditioner. It is located in the rear of the unit. To use an alternate input power connection internal wiring connections
must be made. The alternate input power connector is designated as (J1). Refer to Unit Maintenance and Schematic
Diagram, WP 0122-00.
END OF TASK
0005-00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |