Click here to make tpub.com your Home Page

Page Title: HEATER SUBASSEMBLY UNIT MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
HEATER SUBASSEMBLY UNIT MAINTENANCE
THIS WORK PACKAGE COVERS:
Inspection, Test, Removal, Repair, and Installation
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
Tool Kit, General Mechanics (Item 1, Table 2, WP 0118-00)
Materials/Parts
Lint Free Cloth (Item 9, WP 0121-00)
Warm Soapy Water
References
Schematic Diagram, WP 0122-00
Heater Cutout Switches WP 0027-00
Test Equipment
Equipment Condition
Air conditioner shut down and cool.
Power disconnected from unit.
Top covers removed (WP 0019-00).
Circuit breaker panels, control module and junction box partially removed (WP 0033-00,
Heater cutout switches tested (WP 0027-00).
WARNING
Allow heating elements to cool for 15 minutes or more before touching.
WARNING
Disconnect air conditioner power supply.
0028-00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business