TM 9-4120-430-14
0013 00
NOTE
Before using fault procedures, be sure you have performed all applicable operating checks.
FAULT PROCEDURE 1. AIR CONDITIONER FAILS TO OPERATE.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
AIR CONDITIONER FAILS TO OPERATE.
Step 1.
Make sure that you are using the correct voltage and phase.
Check line voltage with multimeter for 208 V ac, three-phase, 50/60 Hz power (S9160-18KH-3
unit) or 230 V ac, single phase, 50/60 Hz (S9150-18KH-1 unit).
NOTE
The J2 connector is the main power input connecter. The J1 connector at the back of
the unit is the ALTERNATE input connector. To use the J1 ALTERNATE
connector, the TB1 connections must be shifted from J2 to J1. Refer to CONNECT
POWER SOURCE procedures in WP 0014 00 and to wiring schematic in WP 0038
Step 2.
Check to see that main power cable is connected to air conditioner and power source.
Connect power cable to receptacle. See WP 0038 00 schematic diagram.
Step 3.
Check to see whether CIRCUIT BREAKER is in the OFF position or is defective.
Reset circuit breaker.
Make continuity check with multimeter. Refer to WP0027 00.
Step 4.
Inspect main power receptacle connections for breaks.
Replace connector. (Refer to WP 0029 00).
Step 5.
Inspect rotary selector switch for incorrect setting. (See Table of Operator Control Settings.)
Turn selector switch to COOL or VENTILATE.
Step 6.
Disconnect control circuit transformer and make continuity check of primary and secondary
windings, and from windings-to-case, using ohmmeter.
If windings do not show continuity or if windings-to-case continuity exists, replace transformer.
(Refer to WP0030 00).
FAULT PROCEDURE 2. INSUFFICIENT COOLING.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
INSUFFICIENT COOLING
Step 1.
Check to see that Mode Selector switch is properly positioned.
Turn selector switch to COOL.
0013 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |