Click here to make tpub.com your Home Page

Page Title: SOLENOID VALVE AND HOT GAS BYPASS VALVE MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-430-14
DIRECT SUPPORT MAINTENANCE
AIR CONDITIONER, COMPACT, HORIZONTAL
SOLENOID VALVE AND HOT GAS BYPASS VALVE MAINTENANCE
TEST, REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanics (Item 1, Table 2, WP 0067 00)
Tool Kit, Service, Refrigeration Unit (Item 2, WP 0067 00)
Recovery and Recycle Unit, Refrigerant (Item 5, WP 0067 00)
Mask, Air Filtering (Item 29, Table 1, WP 0069 00)
Test Equipment
Electronic refrigerant gas leak detector (See TM 9-4940-509-14&P)
Materials/Parts
Nitrogen (Item 4, WP 0069 00)
Brazing alloy (Item 5 or 6, Table 1, WP 0069 00)
Brazing flux (Item 7, Table 1, WP 0069 00)
References
TM 9-4940-509-14&P
Personnel Required
One
Equipment Condition
Mode selector switch in OFF position.
Main power source is disconnected
Top cover removed (WP 0018 00)
Refrigerant system discharged (WP 0044 00)
System purged with nitrogen (WP 0050 00)
Related tube connections debrazed (WP 0046 00)
Special Environmental Condition
WARNING
REFRIGERANT-22 (R-22)
Unit contains R-22, a chemical substance which harms public health and the
environment by destroying ozone in the upper atmosphere, and that the equipment is
to be serviced by qualified personnel only.
Operation of the recovery/recycling unit must be by AUTHORIZED PERSONNEL
ONLY.
0052 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business