TM 10-8145-222-23
MAINTAINER MAINTENANCE
MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM (MTRCS)
SERVICE UPON RECEIPT
INITIAL SETUP:
Equipment Condition
References
Refrigeration unit shut down (TM 10-8145-222-10)
Personnel Required
DA Pam 738-750
DA Pam 750-8
Automated Logistical Specialist (2), or
SF 361
Food Service Specialist (2)
SITING
When operating the unit at a fixed site, select an area that is flat and level. The site should provide good water
drainage away from the container. If refrigeration is powered by an external electrical source, locate container within
forty feet of the electrical source.
SHELTER REQUIREMENTS
The MTRCS does not require any special sheltering. Storing the container under cover, if available, will minimize
routine maintenance and improve overall temperature control.
SERVICE UPON RECEIPT OF MATERIAL
1. Inspect equipment for damage incurred during shipment. If equipment is damaged, report damage on SF 361,
Transportation Discrepancy Report.
2. Check equipment against packing slip to see if shipment is complete. Report all discrepancies following the
instructions of DA Pam 738-750 or DA Pam 750-8 as applicable.
3. Check equipment for unauthorized modification (WP 0002) and if modified report to your commander.
END OF TASK
INSTALLATION INSTRUCTIONS
Check provided components against Components of End Item (COEI) and Basic Issue Items (BII) lists (TM 10-8145-
222-10).
END OF TASK
0009-1