TM 10-8145-222-23
0060
REPLACE CONTINUED
12. Carefully crawl to roof access point and climb off MTRCS.
13. Install three bolts (Figure 18, Item 1), lock washers (Figure 18, Item 2), washers (Figure 18, Item 3), and nuts
(Figure 18, Item 4) to secure refrigeration unit to support angle at front end near bale bar. Do not tighten
hardware completely at this time.
Figure 18. Support Angle Bolt Layout.
14. Install two bottom bolts (Figure 17, Item 1), lock washers (Figure 17, Item 2), and washers (Figure 17, Item 3)
through mount holes at bottom of refrigeration unit (Figure 17, Item 4) and into front wall of container in two
places. Do not tighten hardware completely at this time.
15. Torque four bolts (Figure 17, Item 5 and Item 1) securing refrigeration unit to container front wall to 80 foot-
16. Tighten three bolts (Figure 18, Item 1) securing refrigeration unit to support angle to 36 foot-pounds (WP 0091).
17. Position seal bracket (Figure 18, Item 6) up against frame and tighten 9 screws (Figure 18, Item 5).
18. Carefully back forklift away from MTRCS and lower tines to ground.
19. Install radiator cap (Figure 14, Item 1).
20. Access top of MTRCS using roof access provided.
21. Install diesel engine exhaust pipe (Figure 19, Item 2) to correct orientation and tighten U-bolt (Figure 19,
Item 1).