|
|
Figure 5-4. Compressor overload protector and heater thermostat
removal and wiring. (Sheet 2 of 2).
d. Installation. Replace a defective rectifier in
box. Power is distributed from these terminal
reverse order of removal as illustrated on figure
blocks to all electrical components of the air condi-
tioner. All terminal blocks are removed and in-
stalled in a similar manner.
b. Removal. Remove terminal blocks as illus-
a. General. There are three terminal blocks on
trated on figure 5-9.
model CE20VAL6 and only two on model
CE20VAL4. They are all mounted in the control
c. Installation. Replace defective terminal blocks
AGO 20053A
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |