Click here to make tpub.com your Home Page

Page Title: MAIN POWER INPUT CONNECTOR (J2) and ALTERNATE POWER INPUT CONNECTOR (J1) UNIT MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
MAIN POWER INPUT CONNECTOR (J2) and ALTERNATE POWER INPUT
CONNECTOR (J1) UNIT MAINTENANCE
THIS WORK PACKAGE COVERS:
Inspection, Removal, Test, Repair, and Installation
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
Tool Kit, General Mechanics (Item 1, Table 2, WP 0118-00)
Materials/Parts
Solder (Item 2, WP 0121-00)
Flux (Item 15, WP 0121-00)
Test Equipment
References
Schematic Diagram, WP 0122-00
Equipment Condition
Main power source is disconnected.
Top covers removed (WP 0019-00).
Circuit breaker removed (WP 0033-00).
WARNING
Disconnect air conditioner power supply.
INSPECTION
1.
Inspect all installed wiring for cracked or frayed insulation and loose conductor strands at connections.
2.
Repair or replace bad wiring.
3.
Inspect electrical connectors for damage.
4.
Replace damaged connectors.
0043-00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business