Click here to make tpub.com your Home Page

Page Title: REFRIGERATION UNIT HIGH PRESSURE CUT-OUT SWITCH REPLACE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-4110-262-13&P
DIRECT SUPPORT MAINTENANCE
ADVANCED DESIGN REFRIGERATOR, 300 CUBIC FOOT (ADR-300)
REFRIGERATION UNIT HIGH PRESSURE CUT-OUT SWITCH
REPLACE
INITIAL SETUP
Personnel Required
Tools and special tools
HVAC Technician (MOS 52C, AFSC 3E1x1) (1)
Tool Kit, Refrigeration Service
(WP 0051 00, Table 2, Item 5)
References
Refrigeration System Service (WP 0031 00)
Materials and Parts
Refrigerant R404A (WP 0068 00, Item 16)
Compressor Oil (WP 0068 00, Item 5)
Equipment Conditions
High Pressure Cut-out Switch
No specified condition
Thread Sealer, Refrigerant
NOTE
The following procedures involve servicing the refrigeration system.
Some of these service procedures are regulated by Federal, and in some
cases, by State and Local laws. All regulated refrigeration service
procedures must be performed by an EPA certified technician, using
approved equipment and complying with all Federal, State and Local
laws. Failure to comply may cause damage to equipment
NOTE
Replace the dehydrator whenever the high side is opened or when the
low side is opened for an extended period of time.
REPLACE
1. Remove the condenser section front and top grilles.
2. Recover the refrigerant charge as outlined in WP 0031 00.
3. Disconnect the wires. Remove the defective switch using a backup wrench.
0039 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business