• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
The accumulator will need to be loosened from its mounting position
Main Heat Solenoid Valve

TECHNICAL MANUAL FOR MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM
Page Navigation
  609    610    611    612    613  614  615    616    617    618    619  
img
. . . . . . .
TM 10-8145-222-23
0062
REPLACE CONTINUED
19. Reinstall refrigeration unit onto MTRCS (WP 0059, Install).
20. Perform refrigeration system dehydration (WP 0014, Service).
21. Release refrigerant into system (WP 0014, Service).
22. Install top-middle panel (WP 0013, Install).
23. Install top-left panel (WP 0013, Install).
24. Reconnect battery negative (-) terminal (WP 0053, Reconnect).
25. Start refrigeration unit and operate in cool mode (TM 10-8415-222-10, Operating Procedures).
26. Check refrigerant level and charge system with refrigerant as required (WP 0014, Service).
27. Place MTRCS back into desired mode of operation (TM 10-8415-222-10, Operating Procedures).
END OF TASK
END OF WORK PACKAGE
0062-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.