• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Refrigeration Support Bracket Installation.
MAINTAINER MAINTENANCE COMPRESSOR PRESSURE REGULATING VALVE REPLACE

TECHNICAL MANUAL FOR MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM
Page Navigation
  605    606    607    608    609  610  611    612    613    614    615  
img
. . . . . .
TM 10-8145-222-23
0061
REPLACE CONTINUED
33. Perform evacuation and dehydration to 500 ( 25) microns (29.90 Hg vacuum) (WP 0014, Service).
34. Monitor manifold gauge for five minutes.
 If pressure rises, perform refrigerant leak check (WP 0014, Service).
 If pressure does not rise, proceed to next step.
35. Install manifold gauges (WP 0014, Service).
36. Start refrigeration unit in cool mode and run for 10 minutes (TM 10-8415-222-10, Operating Procedures).
 Check refrigerant charge by blocking off airflow to condenser coil until discharge pressure can be maintained
at 210 psig. Charge system with refrigerant as required (WP 0014, Service).
37. Shut down refrigeration unit (TM 10-8415-222-10, Operating Procedures).
CAUTION
A new compressor needs to be checked for oil level after usage. As compressor
operates for the first time, oil will migrate to various internal compressor passages.
As a result, oil level may need to be adjusted.
38. Check compressor oil level and service as required (WP 0016, Service).
39. Operate refrigeration unit to verify refrigeration cycles are operational after compressor replacement (TM 10-
8415-222-10, Operating Procedures). Check compressor oil level and service as required (WP 0016, Service).
40. Place MTRCS back into desired mode of operation (TM 10-8415-222-10, Operating Procedures).
END OF TASK
END OF WORK PACKAGE
0061-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.