TM 10-8145-222-23
0083
REPAIR CONTINUED
NOTE
It may be necessary to raise the power box slightly to allow the top mounting bracket
to clear the frame.
15. Move power box into position on MTRCS.
16. After clearing front frame, align top power box mount holes with mount holes on container wall.
17. Secure top of power box (Figure 12, Item 4) to container wall (Figure 12, Item 5) using four bolts (Figure 12,
Item 1), lock washers (Figure 12, Item 2), and washers (Figure 12, Item 3).
18. Secure bottom of power box (Figure 11, Item 4) to container wall (Figure 11, Item 5) using four bolts (Figure 11,
Item 1), lock washers (Figure 11, Item 2), and washers (Figure 11, Item 3).
19. Carefully lower forklift tines and slowly back forklift away from MTRCS.
20. Install control panel assembly (Figure 9, Item 2) with four bolts (Figure 9, Item 1) and spacers (Figure 9, Item 4)
to power box (Figure 8, Item 4) and secure using four nuts (Figure 8, Item 1), lock washers (Figure 8, Item 2),
and washers (Figure 8, Item 3). Ensure nylon spacer/washer is between control panel and power box.
21. Close control panel assembly door (Figure 6, Item 2).
22. Install cable assembly P2A by pulling cable back into position on storage hooks (Figure 7).
23. Install cable assembly P1A by pulling cable back into position on storage hooks (Figure 7).
24. Close power box door (Figure 6, Item 1).
25. Connect the following electrical connectors as tagged.
P3/J3
P4/J4
P5/J5
P6/J6
P7/J7
P8/J8
P9/J9
P10/J10
P11/J11
P12/J12
P13/J13
26. Secure wire bundle (Figure 5, Item 1) above control panel (Figure 5, Item 2) using tie wraps.
END OF TASK
END OF WORK PACKAGE
0083-20