• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Bottom Power Box Mount Bolts.
Figure 13. Power Box Removal.

TECHNICAL MANUAL FOR MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM
Page Navigation
  875    876    877    878    879  880  881    882    883    884    885  
img
.
TM 10-8145-222-23
0084
REPAIR CONTINUED
13. Remove four bolts (Figure 12, Item 1), lock washers (Figure 12, Item 2), and washers (Figure 12, Item 3)
securing top of power box (Figure 12, Item 4) to container wall (Figure 12, Item 5).
Figure 12. Top Power Box Mount Bolts.
CAUTION
Ensure wires and cables are clear of control panel and power box before moving
forklift. It may be necessary to lower the power box slightly to allow the top mounting
bracket to clear the frame.
14. Carefully and slowly reposition fork lift to ensure the power box and electrical box are supported and clear of
frame on MTRCS front.
15. Slowly back forklift away from MTRCS until power box is clear of MTRCS.
0084-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.