TM 10-8145-222-23
0084
REPAIR CONTINUED
13. Remove four bolts (Figure 12, Item 1), lock washers (Figure 12, Item 2), and washers (Figure 12, Item 3)
securing top of power box (Figure 12, Item 4) to container wall (Figure 12, Item 5).
Figure 12. Top Power Box Mount Bolts.
CAUTION
Ensure wires and cables are clear of control panel and power box before moving
forklift. It may be necessary to lower the power box slightly to allow the top mounting
bracket to clear the frame.
14. Carefully and slowly reposition fork lift to ensure the power box and electrical box are supported and clear of
frame on MTRCS front.
15. Slowly back forklift away from MTRCS until power box is clear of MTRCS.